Manufacturing Process

From raw material to finished product — precision engineering at every step

Our 7-Step Production Process

1
Material Selection

Premium-grade steel and raw materials sourced from certified suppliers. Each batch undergoes chemical composition analysis before entering production.

2
Heat Treatment

Controlled hardening and tempering processes ensure optimal hardness and fatigue resistance for piston rods and critical components.

3
Surface Treatment

Chrome plating, electrophoretic coating, and powder coating provide superior corrosion resistance for long service life.

4
Assembly

Automated and semi-automated assembly lines with nitrogen gas charging stations ensure consistent damping force in every unit.

5
Performance Testing

Every production batch undergoes dynamometer testing for force-displacement characteristics, ensuring OE-spec performance.

6
Quality Inspection

100% leak testing, dimensional verification, and visual inspection. AQL sampling for cosmetic and packaging quality.

7
Packaging & Shipping

Anti-rust treatment, branded packaging, and palletized shipping. FIFO warehouse management ensures freshness of inventory.

Quality Control Standards

Force Testing

Dynamometer verification of compression & rebound forces

Leak Detection

100% nitrogen seal integrity testing

Fatigue Life

Minimum 500,000 cycle endurance validation

Salt Spray

480+ hour salt spray corrosion resistance test

QUALITY POLICY

At VSRV, we manufacture and deliver anti-vibration auto parts made of rubber, metal, aluminum, and plastic, meeting our objectives for profitability, productivity, operational efficiency, quality, and delivery times, while consistently satisfying the requirements of our customers and stakeholders, and committing to the complete satisfaction and continuous improvement of our Quality Management System.

QUALITY OBJECTIVES

1

Achieve 95% compliance with the Billing Plan, contributing to profitability.

2

90% compliance with the Production Plan per Work Center, related to Productivity

3

Achieve 95% compliance with the Production Plan in terms of Delivery Time.

4

To achieve Operational Efficiency, we will maintain a maximum SCRAP rate of 1%

5

98% compliance with the Preventive Machinery Maintenance Plan, contributing to operational efficiency

6

Achieve at least 3 implemented improvement projects that contribute to the strategy by enhancing Operational Efficiency

7

Achieve “Zero” customer complaints by ensuring the Quality of our products

8

Contribute at least 1 action to environmental impact

Test Specifications

All VSRV shock absorbers are tested to meet or exceed the following standards:

Test ParameterStandardRequirementVSRV Average
Damping Force ToleranceOE Specification±10%±5%
Fatigue LifeGB/T 5909≥500,000 cycles800,000+ cycles
Salt Spray ResistanceASTM B117≥480 hours720+ hours
Operating TemperatureInternal-40°C to +120°C-40°C to +130°C
Nitrogen PressureOE SpecificationWithin spec ±0.5 bar±0.2 bar
Rod Surface HardnessISO 6508≥60 HRC62-65 HRC